For your information, here is the breakdown of the retrofit plan:
- August 5th to 10th: Our Operations team will be emptying the water from the pool and preparing the bulkhead for retrofitting.
- August 10th to 23rd: The retrofitting will take place, and meanwhile the 20-person hot-tub will be drained, and the tiles regrouted.
- August 23rd to 28th: The Operations team will refill the training pool with water, and make sure it is safe to reopen to the public.
No comments:
Post a Comment